
Buyers usually ask for a price and receive a number that turns out to be only part of what they will pay. A prestige camden gardens cost sheet...
Buyers usually ask for a price and receive a number that turns out to be only part of what they will pay. A prestige camden gardens cost sheet breakup does the opposite: it lists the base value of a chosen home and every charge stacked on top of it, so the figure at the end is the one that reaches your bank account statement.
Two apartments in the same tower rarely cost the same. Floor level changes the rate, facing and view change it again, and the parking allotted to a home forms part of the package. At Prestige Camden Gardens, pricing is shared on request for every configuration precisely because of this: a single headline figure for a 117-home tower would mislead more buyers than it helped. The five formats run from the 1,578 sft three-bedroom Smart through Optima, Prima and Supreme at 2,149 sft, up to the 2,732 sft four-bedroom Ultima, and each carries its own statement.
A prestige camden gardens cost sheet breakup is organised in three layers: the developer's charges, the statutory charges, and the one-time deposits that fund the community after handover. The table below sets out how those layers usually read.
Component | What It Covers |
|---|---|
Base value | The price of the selected unit, calculated on super built-up area |
Floor rise and location charge | Adjustments for floor level, facing and view, where applicable |
Car parking | As per the allotment for that home |
Club membership | A one-time charge towards the clubhouse |
Maintenance deposit or corpus | Collected at handover to fund the owners' association |
GST | 5% on under-construction residential units, without input tax credit |
Stamp duty and registration | At prevailing Karnataka rates, payable at registration |
Timing decides the tax. GST on under construction flats applies at 5% for non-affordable residential units and comes without input tax credit, and the levy stops once the occupancy certificate is issued. Anyone buying at this stage should therefore read the completion position first: Karnataka RERA carries a proposed completion date of 31 December 2027 for this project, so purchases made now fall inside the taxable window. Budget for that 5% from the outset rather than treating it as a late addition.
State charges arrive at the end and catch people out. Stamp duty on apartments Karnataka levies currently runs at about 5% for properties above Rs 45 lakh, with applicable surcharge and cess, alongside a registration fee of 1%. Those rates are set by the state and revised from time to time, so the amount payable is the one in force on the day of registration rather than the one quoted at booking. Ask for the figure to be shown as a separate line rather than folded into a rounded total.
Comparisons across projects break down when one seller quotes a base rate and another quotes everything. An all inclusive flat price bangalore buyers can actually compare should carry the base value, parking, club membership, corpus, GST and statutory charges in the same statement. Ask for it in writing, then compare like with like across your shortlist. If a competing quote looks lower, check whether it excludes the corpus or the club charge before drawing a conclusion.
Which floor and facing does this quote apply to, and what changes if I move up two floors?
Is car parking included, and on which basement level?
What is the club membership charge and what does it cover?
How is the maintenance deposit calculated, and for how many months?
Are GST and stamp duty shown separately from the base value?
Which milestones trigger each instalment under the payment plan?
One rule protects every buyer in a registered project: payments belong in the RERA-designated project account and nowhere else. This development is registered as PRM/KA/RERA/1251/472/PR/140524/006872, and the state authority publishes that instruction on every project page. Keep receipts against each milestone, match them to the payment schedule, and check them against the quarterly progress updates filed with the authority.
Tell us the configuration, the floor band and the facing you prefer, and we will send a written statement for that specific home with every line item shown. Read it alongside the floor plate, the specification schedule and the payment plan, since the four documents together answer almost every question a buyer has before booking. Nothing in a cost sheet replaces the agreement for sale, which carries the binding figures and the carpet area. Ask for the prestige camden gardens cost sheet breakup in writing, and keep it beside the payment schedule as construction progresses.
Request your unit-wise cost sheet — Enquire Now
Related reading: Prestige Camden Gardens Payment Plan: Construction-Linked Schedule Guide.
What does the Prestige Camden Gardens cost sheet include?
A complete statement carries the base value for the selected unit, floor rise and location charges where applicable, car parking, club membership, the maintenance deposit, GST at 5% on under-construction homes, and stamp duty and registration at prevailing Karnataka rates.
Is GST payable on this project?
GST at 5% applies to under-construction residential units in the non-affordable category, without input tax credit. The levy stops once the occupancy certificate is issued, and completion is proposed for 31 December 2027.
Why is pricing shared on request?
Floor level, facing, view and parking allotment each change the figure for an individual home, so a single headline price across a 117-home tower would misstate most of the units in it.

Captive centres changed the profile of the city's office demand, and housing followed. The gcc impact on bangalore real estate is easiest to see in...

Industrial employment shapes housing demand differently from office employment, and northern Bengaluru now carries both. The kiadb aerospace park...

City-level narratives explain less than corridor-level numbers, which is why any answer to what is driving bangalore real estate growth in 2026...

Wealth created by young companies eventually buys property, and Bengaluru has produced more of it than any other Indian city. The startup growth...